If you’ve been thinking about solar panels but aren’t sure whether they’re worth it in the North West — you’re not alone. It’s the question we get asked most at FCR Electrical, and the honest answer might surprise you.

Yes, solar works in Lancashire. Yes, even in Blackpool.

Solar panels generate electricity from daylight — not direct sunshine. That means even on an overcast day in February, your panels are still producing energy for your home. The UK receives enough daylight year-round for solar to be a genuinely worthwhile investment, and the North West is no exception.

The key metric isn’t sunshine hours — it’s your electricity bill. If you’re paying over £100 a month for electricity (and most households are post-energy-crisis), solar can make a real dent in that figure from day one.

A standard 10-panel system on a three-bedroom semi in Lancashire can generate between 3,000 and 4,000 kWh per year. With the average unit cost of electricity sitting above 24p/kWh, that’s a potential saving of £720–£960 annually — just from what you use yourself. Add battery storage and you push that further by holding surplus energy for evenings and weekends.

Any electricity your panels generate that you don’t use gets exported to the grid — and you get paid for it. Under the Smart Export Guarantee, energy suppliers are required to pay you for every unit you send back. Rates vary by supplier, so it’s worth shopping around, but this passive income on top of your savings makes the payback period even shorter.

This is where many homeowners catch out. If your solar installer isn’t MCS registered, you cannot access the Smart Export Guarantee payments. Full stop. MCS (Microgeneration Certification Scheme) is the industry quality standard — it means your system has been installed to a verified specification and you’re entitled to all available incentives.

FCR Electrical are fully MCS registered. Every solar installation we complete comes with the certification you need to register for SEG payments, and we handle all the paperwork with your DNO (Distribution Network Operator) as part of the service.

Our process is straightforward. We start with a free consultation — either over the phone or in person — where we look at your roof orientation, shading, current usage, and bill. We then provide a detailed quote with a projected payback period, no obligation.

Installation typically takes one to two days for a domestic system. Our NICEIC-approved engineers handle everything: mounting, wiring, inverter installation, and grid connection. You’ll receive a full MCS certificate and handover briefing so you know exactly how your system performs.

South-facing roofs are ideal, but east or west-facing roofs still produce well. The main factors are: roof area (you need roughly 1.7m² per panel), roof condition, and shading from trees or neighbouring buildings. We assess all of this before any commitment is made on your part. Find more information on solar panel installation in Blackpool here https://fcrelectrical.co.uk/solar-panel-installers/

FCR Electrical install solar panels across Lancashire, Blackpool, the Fylde Coast, Preston, and throughout the North West. We’re MCS registered, NICEIC approved, and have been helping homeowners and businesses cut their energy bills for years.

Call us on 01253 364 029 or get in touch via our website for a free, no-obligation consultation. We’ll tell you honestly whether solar stacks up for your property — and if it does, we’ll give you the full picture on costs, savings, and payback.

    Your Name

    Your Address

    Your Email address

    Your Phone Number

    The best day to contact you?

    The best time to contact you?

    Please explain what service(s) you require: